The Railway though consisting of 2 Sections
should be maintained and worked as a single continuous
Railway so that trains would run and traffic be carried
continuously throughout the whole line without break or
charge.
3
There should be connection at Canton
between the Canton-Kowloon Railway and the Canton-Hankow
Railway so that trains should run and traffic should be
carried from one line to the other without break or charge.
4.
When the Railway approaches completion a
joint Board of Management should be formed composed of 4
Members (two appointed by each Government) and a General
Manager to be selected by agreement between the two Govern-
ments. This Board shall have control of the working of the
Railway.
5.
In deciding how the net profits earned on
the whole railway should be divided between the two
Governments the capital expenditure per mile on construc-
tion should be taken into consideration.
6.
Only one set of workshops will be required
for the whole line and they would be best situated at
Kowloon
T
द
I
}
18
mar! S
(visteroe? Istnolo) .nOH
Lo Fu Ferry.
Y!{ wea I
2.
sɗt no gatetion widt grøteni? ww
-notnað ent vot jnemserga gatxrow tutol sɗd to Joe¿due
aongreler a yď wolvietai sit baɔnormoo of yawilaя noolwoX
*
Tiedt vɗ molterogto) ert doldw aiddiw adtnom tale edt of
bise 1 .noitaimtenoo rot yenom eɗð sæist of araw tnemSSIŅĀ
pottisws asw raod eft to galeler and dadd beninamt I tadt
yɗ melat ed of nsw Jarit ti to moitrogong add to tnemeliten
need won bar di jant beilger of .saenot:a) adi yd qu
berevoɔalb bar zent as enon est bluow vent Jant beblosb
editorg no maal on ment svig bluow naod sɗe nt sensia Jadit
midnes reg 7 nødt szom teg bivoo yedd bus yavila” eɗt mori
nent gast NIT OV
.IM
.atnentaevni reddo ni venom riedė no
tnamserq/ gaisro Jakob sit to JasmeIttea erið Jadt dian
and To? Teenigni told: s to tneminioqqs edit tlawa teum
szentɗo sit selvbs bluow odw omil edt to nottoeë suerido
of hamasa UW .ïĨ BÁ ‚atosqas Isoindoet att of bragør dikw
-9979A ent tarw od sa edes of anoltaangua Latoeqa on evadi
gatwollot edit yiteind evo tnew I ybodae blvosla dnem,
-:Jnstroqmi eď ot em of betaeqqa Jadt atxloq
grodynɔk bns aseniɗ) eɗt to noltonut sit
.f
erit ja betoolsa svať ow soalq edt te ed bluoda anoito B
The Railway though consisting of 2 Sections
should be maintained and worked as a single continuous
Railway so that trains would run and traffic be carried
continuously throughout the whole line without break or
charge.
3
There should be connection at Canton
between the Canton-Kowloon Railway and the Canton-Hankow
Railway so that trains should run and traffic should be
earned from one line to the other without break or charge.
4.
When the Railway approaches completion a
joint Board of Management should be formed composed of 4
Members (two appointed by each Government) and a General
Manager to be selected by agreement between the two Govern-
Thanks
-ments. This Board shell have control of the working of the
Railway.
5.
In deciding how the net profits earned on
។
the whole railway should be divided between the two
Governments the capital expenditure per mile on construc-
-tien should be taken into consideration.
6.
Only one set of workshops will be required
for the whole line and they would be best situated at
O.I